 The climb continues as the 488 works hard to get the train up to Cumbres
|
 Train 215 is seen crossing the Rio do Los Pinos trestle as it heads toward Cumbres
|
 Train has departed Cumbres and its all downhill to Antonito
|
 The section house at Cumbres Pass with the train order signal
|
 Train is stopped at Cumbres Pass as it gets inspected and watered
|
 K36 489 gets a needed shot of water at Cumbres beforre heading down grade
|
 K36 489 is right on the summit as it approaches Cumbres
|
 Thunder storms are building as train 215 readys to leave Cumbres
|
 The engineer of 489 concentrates on his spot to stop the train at Cumbres
|
 K36 484 slows train 215 to a stop at the water plug at Cumbres
|